Content - Repairs and modifications

Repairing and performing maintenance work on existing equipment

If the inspection reveals that the risk of failure is (too) high, the operator must take action. The planned measures must be submitted to the specialised organisation for review. The Inspectorate reviews the repairs and maintenance work in accordance with the conventional technical rules.

Do you have any questions about inspection results, repairs or maintenance work? Please contact your

District inspector

Modifications to pressure equipment

Modifications to existing equipment or the partial replacement of existing equipment must be performed in accordance with the technical rules. We review your maintenance plans in the following order:

  • Design review
  • Final evaluation
  • Pressure test
  • Safety acceptance


Please use this form to submit your modification plans to the Pressure Vessel Inspectorate.

Printto the top

Contact

SVTI Schweizerischer Verein
für technische Inspektionen
Kesselinspektorat

Tel: +41 44 877 61 11
Fax: +41 44 877 62 11

service@--anti-clutter--svti.ch

Footer